Technical Services for the Maoming Radar Project

Release time:

On-site pre-burial installation

In February 2025, the staff of the overall department conducted on-site guidance for the pre-installation work of the Maoming S-band dual-polarization weather radar at the Shilongshan radar station in Maoming. 

He provided a detailed explanation to the on-site personnel about the system composition of the radar, the requirements for the civil engineering design interface, and the key points for construction. He also provided on-site guidance throughout the process for the pre-burial

installation of the radar, ensuring the smooth installation of the subsequent radar.


1234

Figure 1 On-site pre-installation of the Maoming radar

New type lightning protection test plan on-site guidance

The Maoming radar adopts a new lightning protection scheme. To ensure the smooth implementation of the scheme, the engineering department staff provided on-site guidance to ensure that the pre-buried positions of the lightning protection grounding points were correct. 

Participated in the on-site seminar, provided detailed explanations on lightning protection-related matters, and determined the final implementation plan. Successfully ensured the construction of the lightning protection scheme for the Maoming radar, and it is now operating  stably.


32


Figure 2: On-site photos of the tower and post-installation images