Maritime Radar Project Technical Services

Release time:

Site selection





From May to December 2024, the overall department assisted the Shenzhen Meteorological Bureau in conducting on-site investigations of the Lu Feng 13-2, Lu Feng 151 and Lu Feng 7-2 oil platforms. Considering factors such as construction land, observation environment, power supply, network, lightning protection, and flood prevention requirements, they provided sufficient theoretical basis and technical support for the selection of the station site for the marine radar project. They also elaborated on this in the "Ocean Meteorological Observation Capacity Enhancement Project", and ultimately helped the Shenzhen Meteorological Bureau select the Lu Feng 13-2 platform as the station site for the weather radar.

1212

Figure 1 On-site survey of an offshore oil platform

Quality Assurance

During the period from 2024 to 2025, in response to the harsh working environment of high temperature, high humidity and high salt spray at sea, structural improvements and special processing requirements were made to the tower section. We also went to the front line to provide relevant technical guidance. 

During the later installation process, we went to the site to solve the problems encountered during the on-site installation, conducted a second check on potential issues, and ensured that the overall installation error remained within the allowable range. After the installation was completed, we provided a second-level guarantee service for the three-proofing of the tower. 

The installation of the Dafeng project was completed with high quality within the delivery time frame.


3434

Figure 2: On-site photos of the tower and post-installation images